PennDOT Cameron/Potter County Maintenance work schedule for the week of August 29 – September 2, 2016

Coudersport, PA – The Pennsylvania Department of Transportation Cameron/Potter County Maintenance announces the following work schedule for the week of August 29 to September 2, weather permitting. Motorists should travel with extra caution in these and all work areas. Motorists should be aware that due to the nature of highway maintenance and emergency work, crews could be working on any highway at any time of the day or night

Potter County 0260
Ditching:
● State Route: 1016 (North Fork)

Spray Patching:
● State Route: 3002 (Cowley Hill Road)

Roadway Restabilization:
● State Route: 4017 (Sunny Side Road)

Mowing:
● State Routes: 0044 (Pine Mountain area - tentatively)

Crack Sealing:
● State Route: 0006 (Galeton area)
● State Route: 0449 (Brookland to Gold)

Sign Work:
● Remove chipping signs on various routes

Bridge Repair:
● State Route: 2002, West Branch Township, 2 miles northeast of Cherry Springs. Detour
in place. (August 22 - September 30)

Cameron County 0240
Drainage Work:
● State Route: 0120 Emporium to Elk County line

Patching:
● State Route: 0120
Mowing:
● Various state routes throughout the county


The following work is scheduled to be completed by contractor, weather permitting:

● Glenn O Hawbaker: shoulder repair on SR0006 from Sweden Valley to Potato City, Monday, 08/29/16. Mill, fill, and paving will start Monday, 08/29/16 thru Thursday, 09/01/2016 from two miles west of Galeton into Galeton.

● Glenn O Hawbaker: SR 0044 between the village of Oleona and Lycoming County line will be closed Tuesday, July 5. A detour using Routes 220, 120 and 144 will be in place.

● Glenn O Hawbaker: preparations for roadway reconstruction on Route 6 in Coudersport Borough (West Street to Ludwig Lane) will begin week of August 29, 2016. There will be short term lane closures and alternating traffic patterns. Expect delays.

● Walsh Granite: W. Main Street (SR 0049) bridge over Marsh Creek near the village of Mills is scheduled to begin week of June 20th. Temporary traffic disruptions with traffic signals will be in place. (June-October)

● I A Construction: installation of new inlets and drain pipes on SR 155 from Keating Summit area towards the Cameron County line. Temporary traffic signals will be in place with short delays possible.

● A L Blades: Route 244 in Ellisburg, Genesee Township, bridge replacement to begin August 1 with bridge closure and detour in place. (August-November)

● L C Whitford: Route 244 in Genesee Township, bridge repairs to begin August 9 to bridge spanning Cryder Creek (southwest of New York state line) . Bridge will be closed with detour in place. (August-October)

● L C Whitford: Route 120 two bridges will be replaced in Shippen Township in Cameron County. Two separate work zones will be in place utilizing temporary traffic signals.

1 comment :

Anonymous said...

The stone and chip work at Shinglehouse area certainly took twice as long as it should have and way too many men standing and sleeping at the ball field parking lot. They stretched it out for weeks. Probably could have repaved with Black Top by a contractor cheaper and more permanent.