Potter County Outfitters

Potter County Outfitters

CIMINO AUTO PARTS

Solomon's Auction & Yard Sale Page

Do You Know: You can buy this marquee ad on Solomon's words for the wise for your business or event for only $10. per day! It's just one of the low cost advertising options available. Your ad is viewed 30,000 to 50,000 times every day. Email us for information on other ad locations.

Friday, September 23, 2016

PennDOT Cameron/Potter County Maintenance work schedule for the week of September 26 – September 30, 2016

Coudersport, PA – The Pennsylvania Department of Transportation Cameron/Potter County Maintenance announces the following work schedule for the week of September 26 to September 30, weather permitting. Motorists should travel with extra caution in these and all work areas. Motorists should be aware that due to the nature of highway maintenance and emergency work, crews could be working on any highway at any time of the day or night

Potter County 0260

Ditching:
● State Route: 0449 (Gold to Genesee)

Patching:
● State Route: 0049 (from intersection of SR 44 & SR 49 to Colesburg)
● State Route: 4009 (Baker Creek)
● State Route: 1009 (Pusher Siding Road)

Crack Sealing:
● State Route: 0006 (West, Coudersport to Roulette)
● State Route: 0872 (Austin to Wharton)

Mowing:
● State Route: 0044 (Sweden Valley to Carter Camp)

Shoulder Repairs:
● State Route: 0006 (Galeton to Tioga County line)
● State Route: 1003 (Loucks Mills Road)

Sign Upgrades:
● Throughout the Coudersport area

Bridge Repair:
● State Route: 2002, West Branch Township, 2 miles northeast of Cherry Springs. Detour
in place. (August 22 - September 30)

Cameron County 0240 

Pipe Replacement:
● State Route: 2001 (Wykoff Run)

Bridge Repair:
● State Route: 4004 (Rich Valley) There will be traffic disruptions. Expect long delays.

Mowing:
● Various routes throughout the county

The following work is scheduled to be completed by contractor, weather permitting:

● Glenn O Hawbaker: work will continue on SR 0144 between the village of Oleona and Clinton County line.

● Glenn O Hawbaker: preparations for roadway reconstruction on Route 6 in Coudersport Borough (West Street to Ludwig Lane). There will be short term lane closures and alternating traffic patterns. Expect delays.

● HRI, Inc: road and drainage improvements near intersection of Routes 120 and 155 in Driftwood Borough. Expect short delays.

● Walsh Granite: SR 0049 bridge over Cowanesque River near the village of Mills is scheduled to begin week of September 12. Temporary traffic signals will be in place.

● I A Construction: installation of new inlets and drain pipes on SR 155 from Keating Summit area towards the Cameron County line. Temporary traffic signals will be in place with short delays possible.

● A L Blades: Route 244 in Ellisburg, Genesee Township, bridge replacement to begin August 1 with bridge closure and detour in place. (August-November)

● L C Whitford: Route 244 in Genesee Township, bridge repairs to begin August 9 to bridge spanning Cryder Creek (southwest of New York state line) . Bridge will be closed with detour in place. (August-October)

● L C Whitford: Route 120 two bridges will be replaced in Shippen Township in Cameron County. Two separate work zones will be in place utilizing temporary traffic signals.

For more information, visit www.dot.state.pa.us or call 814-274-9181

No comments :