...WINTER STORM WARNING REMAINS IN EFFECT FROM 1 PM THIS AFTERNOON TO 10 AM EST TUESDAY... * ACCUMULATIONS...6 TO 10 INCHES OF SNOW. * TIMING...RAIN WILL BECOME MORE STEADY THIS MORNING BEFORE MIXING WITH AND CHANGING TO SNOW THIS AFTERNOON. SNOW WILL FALL HEAVY AT TIMES INTO THE EVENING HOURS BEFORE TAPERING TO LIGHT SNOW AND SNOW SHOWERS AFTER MIDNIGHT. * IMPACTS...SNOW ACCUMULATIONS WILL MAKE TRAVEL VERY HAZARDOUS. THE WEIGHT OF THE HEAVY WET SNOW COULD CAUSE TREE LIMBS TO FALL ON POWER LINES AND PRODUCE OUTAGES. * WINDS...NORTHEAST 5 TO 15 MPH WITH GUSTS UP TO 30 MPH. * TEMPERATURES...IN THE MID 30S. * GREATEST RISK FOR HEAVY SNOW IN THE HIGHER ELEVATIONS. * LONGER COMMUTE TIMES MONDAY EVENING.

Wednesday, January 4, 2017

DEP Developing Enhanced Eligibility Standards for Expedited Review of Erosion and Sediment Control General Permits

Harrisburg, PA – The Pennsylvania Department of Environmental Protection (DEP) has begun revising eligibility standards for expedited review of Erosion and Sediment permit applications related to oil and gas drilling.

The Erosion and Sediment Control General Permits (ESCGP-2) are for earth disturbance of more than 5 acres for oil and gas projects. Under the general permit, projects that meet objective criteria are eligible for a 14-day permit review.

The revisions follow an internal review of two years of permit authorizations, conducted to analyze the consistency and effectiveness of the program from when it began in February 2014 through January 2016. The review revealed that the expedited process has limited application because of the technical deficiencies in almost 60 percent of the permit applications submitted.

As a result of the internal review, DEP staff are developing revisions for eligibility for the expedited review, including objective and clear standards for eligibility, return of applications, removal of applications from the expedited process, improved training for staff and industry applicants, and regular evaluation of the program.

“This review concluded that the expedited review process is very challenging for DEP to implement and has not resulted in higher quality applications nor consistency in environmental protections statewide,” said Acting DEP Secretary Patrick McDonnell. “Through this internal review, we’ve learned that this program only works when DEP receives technically sound and complete application materials at the outset, and we will revise our eligibility requirements accordingly.”

During the review period, DEP received 624 applications for standard review, and 1,054 for expedited review. 59 percent of the expedited review applications were disqualified because they were administratively incomplete or technically deficient, and 436 permits were issued.

DEP’s internal reviewers randomly sampled 23 permits proposing earth disturbance activities of 15 acres or more, and found that only 4 met all the applicable regulatory requirements at the outset. Of the 23 approved applications, 16 had been inspected at least once, and 6 were never constructed, and 1 is under construction currently and has been inspected. Inspections of the reviewed project sites reveal one E&S violation of the expedited permit issued.

The review can be found here, or at http://files.dep.state.pa.us/OilGas/BOGM/BOGMPortalFiles/DEP%20Expedited%20Review%20Evaluation%2012.30.16.pdf.