SOLOMON'S WORDS

Stoltz

DR. Tarbox

DR. Tarbox

xxx

xxx

UPMC Cole Careers

Solomon's Auction & Yard Sale Page

UPMC Cole

Thursday, September 5, 2013

PennDOT Maintenance Work Schedule for September 9–September 13, 2013

PennDOT Maintenance Work Schedule for September 9–September 13, 2013

Potter /Cameron PENNDOT, Potter/Cameron County Maintenance announces the following work schedule for the week of September 9-September 13, weather permitting.

Motorists should travel with extra caution in these and all work areas. Motorists should be aware that due to the nature of highway maintenance and emergency work, crews could be working on any highway at any time of the day or night.

Potter County 0260:

Sign Crew:
• State Route: 1016 (Harrison Valley) Sign Repairs
Bridge Crew:
• State Route: 3002 (Cowley Hill) Bridge Replacement (Road Closed-Detour in Place)
General Maintenance-West:
● State Route: 4008 (South Branch) Rock Lining Ditches
General Maintenance-East:
● State Route: 0449 (Gold to Genesee) Crack Sealing
Tail Ditching:
● State Route: 0144 (Galeton Area) Ditching (Tues-Wed)
● State Route: 1005 (Phoenix Run Road) Ditching (Thurs-Fri)
East Patching:
● State Route: 1002 (Sweden Hill Road) Spray Patching
● State Route: 4013 (North Hollow Road) Spray Patching
West Patching:
• State Route: 0049 (Int. of SR 44 & 49 to Colesburg) Patching (Mon-Wed)
● State Route: 3002 (Cowley Hill Road) Patching (Thurs-Fri)
Mowing Crew:
● State Route: 0155 (Keating Summit Area) Mowing (Mon-Tues)
● State Route: 0607 (Keating Summit Area) Mowing (Wed)
● State Route: 0872 (Austin to Wharton) Mowing (Thurs-Fri)

Cameron County 0240:

• State Route: 0120 Ditching
• State Route: 0872 Mowing

The following work is scheduled to be completed by contractor, weather permitting:

• L C Whitford: State Route 49 (Harrison Valley) Bridge Repair
• Glenn O Hawbaker: State Route 872 (Potter & Cameron) Drainage Improvements and Road Repairs
• LTT Trucking: State Route 0872 (Ladona Area) Bridge Repair (approx. end 09/22/14)

No comments :