SOLOMON'S WORDS

Stoltz

DR. Tarbox

DR. Tarbox

xxx

xxx

UPMC Cole Careers

Solomon's Auction & Yard Sale Page

UPMC Cole

Friday, April 11, 2014

PennDOT Maintenance Work Schedule for Potter County, April 14 – April 18, 2014

PennDOT Maintenance Work Schedule for Potter County, April 14 – April 18, 2014

Potter /Cameron PENNDOT, Potter/Cameron County Maintenance announces the following work schedule for the week of April 14 through April 18, weather permitting.

Motorists should travel with extra caution in these and all work areas. Motorists should be aware that due to the nature of highway maintenance and emergency work, crews could be working on any highway at any time of the day or night.

Potter County 0260:

Sign Crew:
• State Route: Sign Repairs on Various State Routes

Grading:
• State Route: 1005 (Phoenix Run Road)

Bridge Crew:
• State Route: 0006 (Coudersport Borough) Bridge & Sidewalk Repairs

Bridge Flushing:
● Various State Routes in the Coneville Area
● Various State Routes in the Coudersport & Ulysses Area

Sweeping Roads:
● Various State Routes in the Coudersport Area
• Various State Routes in Ulysses & Genesee area

Patching:
● State Route: 3003 (Prouty Road)
● State Route: 4021 (Honeoye Road)

Repair Washouts:
● Various State Routes in the Ulysses & Genesee Area
● State Route: 1003 (Loucks Mills)

Cameron County 0240

Slide Repair:
● State Route: 0120 & 0872 Slide Repair

Sweeping:
● Various Bridges Through Out The County

The following work is scheduled to be completed by contractor, weather permitting:

● LTT Trucking: State Route 1016 (North Fork Road) Bridge Replacement

For more information on PennDOT’s roadway construction and maintenance operations, visit the PennDOT website at www.dot.state.pa.us.

No comments :