SOLOMON'S WORDS

E&G

Stoltz

DR. Tarbox

DR. Tarbox

xxx

xxx

UPMC Cole Careers

Solomon's Auction & Yard Sale Page

UPMC Cole

Thursday, August 21, 2014

PennDOT Maintenance Work Schedule for Potter County, August 25 – August 29, 2014

PennDOT Maintenance Work Schedule for Potter County, August 25 – August 29, 2014

Potter /Cameron PENNDOT, Potter/Cameron County Maintenance announces the following work schedule for the week of August 25 to August 29, weather permitting.

Motorists should travel with extra caution in these and all work areas. Motorists should be aware that due to the nature of highway maintenance and emergency work, crews could be working on any highway at any time of the day or night.

Potter County 0260:

Sign Crew:
• State Route: Various SR’s Throughout the County

Bridge Crew:
• State Route: 0244 (Riverbend/Genesee area) Bridge Maintenance

Side Dozing:
• State Route: 0244 (Genesee area) Monday
• State Route: 0449 (Genesee to Gold) Tuesday-Friday

Tail Ditching:
• State Route: 3003 (Prouty area)
• State Routes: 0607 & 3002 (Austin/Cowley Hill area) Tuesday-Friday

Mill & Fill:
● State Routes: 4003 & 4005 (Fishing Creek Road) Expect Delays

Mowing:
● State Routes: 0049 (Colesburg to Coudersport) Monday
● State Route: 0006 (Coudersport to Galeton) Tuesday-Friday

Cameron County 0240

Shoulder Cutting:
● State Routes: 0120 & 0555

The following work is scheduled to be completed by contractor, weather permitting:

● Glen O Hawbaker: State Route 0144 (Carter Camp to Germania) Pipe Replacement-Alternating Traffic Pattern Will Be Enforced, then During Full Depth Resurfacing, SR 144 Will Be Closed & Detour in Place
● Glen O Hawbaker: State Route 0872 (Cameron) Roadway Improvements-Alternate Traffic Pattern

● LTT Trucking: State Route 1016 (North Fork Road) Bridge Replacement –Road Closure – Detour in Place (effective April 21)
● LTT Trucking: State Route 3013 (Toles Hollow Road) Bridge Closure-Detour in Place (June-October)

● L C Whitford- Bridge Restoration on SR 1022 (Mill Street) in Galeton Borough and SR 3004 (Kim Hill Road) in Roulette Township-Detour in Place (effective May 15). Also Bridge Restoration on SR 0144 over Cross Fork Creek in Stewardson Township.

● L C Whitford-SR 0044 South Branch of Oswayo Creek & SR 0049 Ulysses Township (Luddington Run) Bridge Repairs- SR 0049 (By Intersection of SR 0049 & SR 0044) Temporary Traffic Signals in Place

● A L Blades – SR 1021 (Harrison & Hector Townships) Bridge Closure-Detour
in Place (June-September)
● A L Blades – SR 1018 (Hector Village) Bridge Closure-Detour in Place (July-November)

● Horizon Construction Group – (T-433) Rausch Road, Abbott Township-Bridge Closure-Detour in Place (July-August)

1 comment :

Anonymous said...

When are you coming to Rt 44 South to clean out the ditches????